Skip to content

Roof Replacement

A new roof, planned down to the last flashing.

A replacement is the largest exterior investment most homeowners make. We treat it that way — a measured inspection, a written scope you can compare line by line, and an installation process designed to protect your home from the first tarp to the final magnet sweep.

Roofer removing old shingles from a residential roof
Illustrative photo · Zohair Mirza / Unsplash License

When to call

Signs it may be time to replace

  • Shingles that are curling, cupping, cracked or missing across multiple slopes
  • Granules collecting in gutters or at downspout outlets
  • Daylight, staining or damp insulation visible from the attic
  • Sagging along the ridge or between rafters
  • Repeated leaks in different areas of the roof
  • A roof approaching the end of its expected service life

Our approach

How a replacement comes together

  1. 01

    Measured inspection

    Roof, attic and ventilation are assessed and photographed so the scope is based on what is actually there.

  2. 02

    Written scope

    Materials, underlayment, flashing, ventilation and decking allowances are itemized — no vague line items.

  3. 03

    Protected installation

    Landscaping, siding and driveways are protected before tear-off begins, and the deck is inspected once exposed.

  4. 04

    Documented finish

    A final walkthrough, before-and-after photo record, and a full magnetic sweep for nails.

The details

What a complete replacement scope should cover

Full tear-off
Removal of existing roofing down to the deck, so hidden damage is not covered over.
Deck inspection
Soft or damaged decking is identified and documented before anything new is installed.
Underlayment & ice/water barrier
Specified by area — valleys, eaves and penetrations get the protection they need.
Flashing & penetrations
Chimneys, walls, vents and skylights are re-flashed rather than sealed over.
Balanced ventilation
Intake and exhaust sized together to help protect shingles and reduce attic heat.
Clean-up & photo record
Debris removal, nail sweep, and a photo set of the finished work.

Questions

Roof Replacement: common questions

How long does a typical roof replacement take?
Many single-family replacements are completed in one to three working days, depending on size, complexity, weather and material. Your written scope should include an estimated timeline.
Do I need to be home during the installation?
Not necessarily. Access to the exterior, electricity and the driveway is usually what matters. We recommend moving vehicles and securing items on interior walls that could vibrate during tear-off.
Can new shingles go over my existing roof?
Overlays are sometimes allowed by code, but a full tear-off lets the deck be inspected and usually produces a better long-term result. We plan replacements as tear-offs.

Request an inspection

Start with a conversation, not a sales pitch.

Tell us a little about your roof. When we're open for requests, we'll follow up to schedule an inspection at a time that suits you.

  • A clear answer about what your roof needs
  • Photos of anything we find
  • A written scope before any decision

Prefer to talk? (609) 250-9806

No obligation. No pressure.